Pressure Vessel Cracking - INRAG Follow-up
4/10/2021
Pressure Vessel Cracking [Doel & Tihange Follow-up]
[1] see www.inrag.org
[2] FANC , Doel 3 and Tihange 2 reactor pressure vessels, Provisional evaluation report, January 30, 2013 http://fanc.fgov.be/GED/00000000/3300/3391.pdf [3] FANC, Doel 3 Tihange reactor pressure vessels, Final evaluation report, May 2013, http://www.fanc.fgov.be/GED/00000000/3400/3429.pdf
[4] FANC: Federal Agency for Nuclear Control
[5] Electrabel , Safety case report: Doel 3 – Reactor Pressure Vessel Assessment, 05/12/2012 http://www.fanc.fgov.be/GED/00000000/3300/3390.pdf
[6] Ilse Tweer, Flawed Reactor Pressure Vessels in Belgian Nuclear Plants Doel-3 and Tihange-2. Some Comments on the FANC Provisional evaluation report (January 30, 2013). March 2013, Commissioned by the Greens/EFA Group in the European Parliament, Brussels, http://www.greens- efa.eu/fileadmin/dam/Documents/Studies/Flawed%20Reactor%20Pressure%20Vessels.pdf
https://www.inrag.org/pressure-vessel-cracking-doel-tihange-follow-up
2/2
Made with FlippingBook Ebook Creator