NPP Life Management_vs02
Figure 2: Doel 3 – Size of indications [max (x,y)] versus depth into the RPV steel wall (data 2012) 3 .
Hydrogen and NPP Life Management: Doel 3 and Tihange 2
Figure 3: Tihange 2 – Size of indications [max (x,y)] versus depth into the RPV steel wall (data 2012) 3 .
In September 2012 the same type of “ indications ” , but to a lesser extent, was also found in the Tihange 2 RPV shells during a similar inspection (Figure 3). Both RPV forgings were produced by the same fabricator with steel from the same supplier.
4
Made with FlippingBook - professional solution for displaying marketing and sales documents online